Watch LaterAdded 02:22 AI & Tech Draco Thruster Vacuum Firing November 12, 2010 November 19, 2025 DTS-018/019 – Draco thruster firing at full power for ten minutes, then after a thermal soak, restarts for an additional minut... 011.8K00
Watch LaterAdded 00:11 AI & Tech Falcon Engine Firing November 12, 2010 November 19, 2025 Kestrel development engine with copper chamber, on SpaceX Horizontal Test Stand 2 (HTS-2), McGregor, Texas. 07.7K00
Watch LaterAdded 03:00 AI & Tech Merlin Engine Full Duration Firing November 12, 2010 November 19, 2025 Four views of Merlin 1a engine test, on Vertical Test Stand 1 (VTS-1), with Mission Duty Cycle test – operating for the length... 012.2K00
Watch LaterAdded 00:19 AI & Tech SpaceX Testing – Draco Thruster Vacuum Firing November 12, 2010 November 19, 2025 More information on SpaceX: http://www.spacex.com/ Tweets by SpaceX http://www.facebook.com/SpaceX 011.3K00
Watch LaterAdded 02:33 AI & Tech SpaceX Testing – Dragon Drop Test (HD) November 4, 2010 November 19, 2025 Visit: http://www.spacex.com/ for more information on SpaceX, Dragon, Falcon 9, Falcon Heavy, upcoming rocket launches, or Elon Musk... 04.7K00
Watch LaterAdded 03:31 AI & Tech SpaceX Testing – Falcon 9 Engine Test November 25, 2008 November 19, 2025 The full mission duration test firing of the Falcon 9 first stage lasting nearly 3 minutes. The nine Merlin engines produced 855,000... 05.1K00
Watch LaterAdded 01:21 AI & Tech SpaceX Testing – Merlin Ablative November 12, 2010 November 19, 2025 Test of Merlin 1a engine with ablative chamber on Horizontal Test Stand 1 (HTS1), McGregor, Texas. More information on SpaceX: http... 08.4K00
Watch LaterAdded 05:13 AI & Tech SpaceX Tour – Texas Test Site November 12, 2010 November 19, 2025 Tom Mueller, SpaceX’s VP of Propulsion, gives a tour of our Texas Test Site showing structural and propulsion test facilities... 010.1K00